By carefully selecting our suppliers, we make sure that we only use the products of the right quality.
Every mill we use is measured against a series of predetermined quality control requirements.
Our own handling, processing and packaging procedures ensure that these products reach you, the customer, in prime condition.
Shree Ramdev Metal And Tubes continually improves the effectiveness of the quality management system (QMS) and sets quality objectives and work plans. Moreover, Shree Ramdev Metal And Tubes is committed to upgrade the capabilities of its technical and administrative staff through formal training and continuous technical quality awareness.
We have achieved the high quality through the professional competence of the personnel, high working motivation and a service minded attitude. Every single employee of Shree Ramdev Metal And Tubes is responsible for the quality of his/her work.
All Shree Ramdev Metal And Tubes products are tested in accordance to internationally recognized standards or our own more stringent internal test procedures, which is developed considering the harsh field conditions. In addition to this we also offer specific testing to our client's requirement.
RAW MATERIAL TESTING
All the material used for Manufacturing of fittings and other fabrication jobs are tested for chemical & mechanical properties. The Results are confirmed to meet original material requirement before processing. We are using measuring equipments calibrated by Govt. approved calibration Agencies.
DIMENSIONAL INSPECTION
All type of Flanges and fittings are checked for dimensional accuracy from raw material stage to in process & final product delivery by using calibrated measuring instruments.
MATERIAL TRACEABILITY
All the material used for Manufacturing of fittings, valves and other fabrication jobs are identified & fully traceable from raw material stage to final product.
IN HOUSE TESTING OPTION
HYDRO TEST UP TO 15000 PSI
All type of Fittings & valves are tested at a specified static pressure for a predetermined period for no leakage.
SOME SPECIAL TEST ON REQUEST OF CLINTS:-
PNEUMATIC/GAS TEST
ALL COMPRESSORE AND THREADED FITTINGS and valves are subjected to Pneumatic test at 150psi air pressure and 2000psi Nitrogen pressure. Pneumatic/Gas test is carried out after hydro testing and complete drying of the items following Hydro-Test.
Helium Gas Test (HG-TEST) can be offered on request.
PRESSURE CYCLE TEST
All fittings and valves are tested for pressure cycle test where pressure surges from Opsi to 5000psi. The test is conducted at the rate of 25 to 45 cycles per minute with the digital counter. Client can specify number of cycles and condition of test.
TEMPRATURE TEST ON REQEUST
fittings and valves are heated to temperature upto 350oC for one complete cycle of 4 hours. After that valves are again subjected to Hydro, Pneumatic and Pressure cyclic test for no leakage. All the above test are certified by our own Quality control department and can be witnessed by client or third party inspection company of client's choice.
VIBRATION TEST
fittings and valves are tested for severe vibration under impulse pressure for no leakage
QUALITY ASSURANCE PLAN FOR PIPES |
||
Sr. No. |
Stages Of Inspection |
Inspection By Third Party /Client's Representative |
I. |
RAW MATERIAL IDENTIFICATION and Check testing |
Putting stamps on identified Pipes and Samples and sending samples to Govt. approved Lab. |
|
Dimensional & visual checking |
At random or as desired by third party Inspector / By client's representative & verification of Manufacturer's test Certificate |
|
Chemical Analysis |
Witnessing of Tests & verification of Test Report |
|
Physical - Tensile Test & Micro Test |
Witnessing of Tests & verification of Test Report |
II. |
Acceptance of Materials |
Putting final identification mark on Pipes and issuing of Dispatch Clearance Certificate |
Sr. No. |
Stages Of Inspection |
Inspection By Third Party /Client's Representative |
I. |
RAW MATERIAL IDENTIFICATION and Check testing |
Putting Stamps on identified Raw materials and samples and sending samples to Govt. approved Lab |
|
Dimensional & Visual checking |
At random or as desired by Third Party Inspector / By client's representative |
|
Chemical Analysis |
Witnessing of Tests & Verification of Test Report |
|
Physical - Tensile Test & Micro Test |
Witnessing of Tests & Verification of Test Report |
|
Stamp Transferring |
Only if test conforms to your specification |
II. |
Submission of : WPS |
Approved by Third Party / Client. |
|
PQR |
Witnessed by Third Party Client |
|
WELDERS PERFORMANCE TEST |
Verification of Approved Lab Test Certificate |
|
Filler Wire / Welding Rod |
Chemical Analysis to be carried out /M.T.C. to be verified |
III. |
D. P. Test (a) 100 % Root Run (b) 100 % Final Weld |
To be witnessed by Inspector |
|
Radiographic Examination for 10% Weld joints or as desired by Customer / Inspector |
X- Ray Films and Test Reported to be verified |
|
Hydro Test (On Random samples) |
Test reports to be verified |
|
Pickling and Passivation |
Report shall be submitted to Inspector |
IV. |
Tensile Test on the welded portion, Micro Test on The weld effected area |
To be witnessed and Reports to be verified |
|
Flattening Test of finished pipe |
To be witnessed and Reports to be verified |
V. |
Final Inspection |
Dimensional check & Visual Inspection |
VI. |
Acceptance of Materials |
Putting final acceptance mark on the materials and etching / stenciling and issuing of / dispatch Clearance Certificate |
Sr. No. |
Stages Of Inspection |
Inspection By Third Party /Client's Representative |
I. |
RAW MATERIAL : Identification and Check testing |
Stamping on identified Raw Materials and samples andsending samples to Govt. approved lab |
II. |
DIMENSIONAL & VISUAL CHECKING |
At random or as desired by Third party inspector / by client's Representative |
III. |
CHEMICAL ANALYSIS |
Witnessing of Tests & Verification of Test Report |
IV. |
PHYSICAL : Tensile Test Micro Test |
Witnessing of Tests & Verification of Test Report |
V. |
STAMP TRANSFERRING TO TEMPLATES |
Only if the Tests confirms to order specifications |
VI. |
SUBMISSION OF : WPS |
Approved by Third Party / Client Witness by Third party client |
VII. |
WELDERS PERFORMANCE TEST |
Verification of Approved Lab Test Certificates |
VIII. |
FILLER WIRE / WELDING ROD |
Chemical analysis to be carried out / M.T.C. to be verified |
IX. |
D.P.TEST (a) 100 % Root Run |
To be witnessed by Inspector |
X. |
RADIOGRAPHIC EXAMINATION FOR 10 % WELD JOINTS OR AS DESIRED BY CUSTOMER / INSPECTOR |
X - Ray films and Test Report to be verified |
XI. |
Tensile Test on the Welded portion Micro Test on the weld effected area |
To be witnessed and reports to be verified |
XII. |
HEAT TREATMENT & SOLUTION ANNEALING |
As desired by client / Third Party Inspection Agency |
XIII. |
PICKLING AND PASSIVATION FOR S.S. |
Report shall be submitted to Inspector |
XIV. |
SHORT BLASTING, OILING /WARNISHING AND PAINTING FOR A.S. & C.S. |
Visual Inspection |
XV. |
MARKING |
Etching / Punching of size, sch, specn. & heat No. |
XVI. |
FINAL INSPECTION |
Dimensional check & Visual inspection |
XVII. |
ACCEPTANCE OF MATERIALS |
Putting final Acceptance Identification Marks and issuing of Dispatch Clearance Certificate. |